GE deal to add 1 GWe in South Korea | GE Message Board Posts

General Electric Company

  GE website

GE   /  Message Board  /  Read Message

 

 






Keyword
Subject
Between
and
Rec'd By
Authored By
Minimum Recs
  
Previous Message  Next Message   Post Message   Post a Reply return to message boardtop of board
Msg  6815 of 6866  at  1/20/2021 6:13:33 PM  by

jerrykrause


GE deal to add 1 GWe in South Korea

Energy Monitor Worldwide
 
 

GE deal to add 1 GWe in South Korea

 
 

GE has secured an order expected to deliver more than 1 GWe power generation equipment for Tongyeong combined cycle power plant in South Korea. GE will supply two 7HA.02 gas turbines, one STF-D600 steam turbine, two heat recovery steam generators and three H65 generators. In addition GE has signed an 18-year agreement to provide maintenance services for the 7HA.02 gas turbines and generators.

The new plant, to be located at Anjeong Industrial Park in Tongyeong City, is scheduled to start construction in 2021 and be carried out by Hanwha Engineering & Construction Co, with the start of commercial operations expected in 2024.

Chris Khang, president & CEO of GE Korea commented: Gas power will play a critical role in facilitating South Koreas transition to a lower carbon future. Natural gas-fired combined cycle power plants are the lowest emitting fossil fuel power plants, whether measured by CO2, SOx, NOx, particulate matter, or mercury. Our H-class gas turbines are able to operate on a variety of fuels, including blends of hydrogen and natural gas to offer Tongyeong Eco Power multiple pathways to achieve lower or near-zero carbon operations, if needed in future.

GEs HA gas turbine portfolio is the companys fastest-growing fleet with more than 100 units ordered by more than 45 customers across 20 countries. As of December 2020, the HA fleet has accumulated more than 745 000 operating hours in commercial operations.

In 2016, GE undertook a large-scale investment in Changwon, South Korea, by acquiring Doosans HRSG manufacturing business the HRSG pressure part modules for this project will be built in GEs factory in the city. 2021 Global Data Point.

 


     e-mail to a friend      printer-friendly     add to library      
| More
Recs: 2     Views: 0
Previous Message  Next Message   Post Message   Post a Reply return to message boardtop of board








Financial Market Data provided by
.
Loading...