GE Renewable Energy announces first Cypress onshore wind power contract in Brazil | GE Message Board Posts

General Electric Company

  GE website

GE   /  Message Board  /  Read Message

 

 






Keyword
Subject
Between
and
Rec'd By
Authored By
Minimum Recs
  
Previous Message  Next Message   Post Message   Post a Reply return to message boardtop of board
Msg  6393 of 6434  at  10/9/2019 8:14:27 PM  by

jerrykrause


GE Renewable Energy announces first Cypress onshore wind power contract in Brazil

 
Energy Monitor Worldwide 
 
 

GE Renewable Energy announces first Cypress onshore wind power contract in Brazil

 
 

GEs largest onshore wind turbines will be installed at EDF Renewables wind farm in Bahia. Agreement includes 25 wind turbines and 20 years of operation and maintenance (O&M) services for all the equipment supplied by GE.

GE Renewable Energy announced today it has signed an onshore wind energy contract with EDF Renewables in Brazil. This deal for GEs Cypress platform the companys largest onshore wind turbine is also GEs first contract with EDF Renewables in the country. GE will be responsible for the production and delivery of 25 turbines, that will operate at 5.3 MW.

The new GE machines will be installed at the Ventos da Bahia wind farm, located near the cities of Bonito and Mulungu do Morro, 350 KM from Salvador. Unit heights will range between 101 and 126 meters, with 77-meter carbon blades and a 158-meter rotor.

After installation, these turbines will bring an additional 132.5 MW capacity to EDF Renewables Ventos da Bahia wind farm, which today has an installed capacity of 182 MW.

Vikas Anand, GE Renewable Energys CEO for Onshore Wind, Americas, said: GE is delighted to work with EDF Renewables on this exciting project. GE remains deeply committed to Brazils energy future and we are proud to introduce our Cypress turbine to the regions installed base, enabling additional renewable, sustainable energy access for consumers.

The deal also includes 20 years of operation and maintenance (O&M) services for all the equipment supplied by GE in the facility. The Cypress units will be produced at GEs facility in Camaari (BA). Blades will be produced by LM Wind Power, a GE Renewable Energys business unit located in the Port of Suape (PE).

Brazil has been actively investing in renewable sources as an alternative to diversify the energy mix, recognizing environmental and economic advantages of doing so. Specifically, in the onshore wind sector, the country has more than 600 wind parks and 7,500 wind turbines, with GE supplying nearly 40% of the installed base across the country. 2019 Global Data Point.



     e-mail to a friend      printer-friendly     add to library      
| More
Recs: 1     Views: 30
Previous Message  Next Message   Post Message   Post a Reply return to message boardtop of board


About Us  •  Contact Us  •  Follow Us on Twitter  •  Members Directory  •  Help Center  •  Advertise
Not a member yet? What are you waiting for? Create Account
Want to contribute? Support InvestorVillage by donating
© 2003-2019 Investorvillage.com. All rights reserved. User Agreement
   
Financial Market Data provided by
.


Loading...