Campbell – Serious Discussion on CCH / CBLRF
|
![]() |
![]() ![]() |
![]() |
|
|
||
![]() |
![]() |
![]() |
![]() ![]() |
![]() |
|
|
||
![]() |
![]() |
Joe Mann's gold press releases In reviewing all press releases available dating back to 1994 this is
some of the information I came across. these three press releases show two seperate ore bodies having together possibly over 1 million oz of gold: http://www.thefreelibrary.com/ Excerpt from above: Construction will begin in December and will
take up to 18 months to complete. The deepened shaft will allow access to mine the 1,512,000 tons of ore grading 0.267 oz. gold/ton, or 404,000 ounces of gold that have been identified through exploration drilling over the past two years, below the deepest currently developed mine level. Excerpt from above link: Potential for a deposit of up to 500,000
ounces of gold in the West Zone is indicated. Its proximity to the existing shaft, combined with excess hoisting and mill capacities could contribute to increased production over the next few years According to press releases from Campbell, following the discovery of
over 1 million oz gold, LESS than 200,000 oz of gold was ever mined. !!!! When I asked A.f. about these press releases he said the gold could not be mined profitably ? . 10 Million needed
to be spent in tunneling and drilling and that the MOTHER LOAD had never been found at Joe Mann.
Hmmmm
|
![]() |